Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Retaining walls
2004
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Landscaping - Removing existing soil vegetation. Applying pre-emergent on entire area, install fabric on entire area. Install tree/shrubs.
2004
3
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the ArmyTaxiway lighting - Solar taxiway lighting at Libby Army Airfield.
2004
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Running track
2005
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Running track
2005
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
PT field- Construction for the installation of pull up, chin up and dip bars.
2005
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Motor pool fence-Installing chain link fence with two gates at each side of fence. Install barbed wire along top to match existing around motor pool area.
2005
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Greely Hall Rooms-Remove partition wall and door. Remove all ceiling receptacles except in the 15 feet area closest to the corridor door. Soundproof ceilings with sealed battens. Install electrical, add smoke detectors and upgrade alarm systems.
2005
Organ Pipe National Monument Border Vehicle Barrier
Ajo, AZ
40miles of permanent vehicle barriers - included clearing and grubbing, disposal of stripping, drilling of caisson footing, concrete production with volumetric equipment, placement of concrete fittings, steel erection and welding, three phases of constructing all permanent barriers for the 40+ mile segment to include PVB and Normandy Barriers A critical aspect of the project was the construction and maintenance of a roadway to accommodate heavy equipment access along the border from Lukeville, Arizona to the project site.
2006
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
PT field - Clearing brush and grade between existing drainage culverts. Remove/haul all brush and debris from the site. Compact entire area, install rip-rap along sides. Grade new PT field. Provide field lighting.
2006
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the ArmyHays Parking Lot
2006
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the ArmyDrainage - drainage near temporary barracks.
2006
Fort Huachuca BOA
Fort Huachuca, AZ
Department of the Army
Warrior Skills Area
2006
Fort Bliss MATOC
El Paso, TX
U.S. Army Corps of Engineers
Haul road and parking lot-Excavating & grading road, installing culverts, headwalls, stripping, and road signs.
2007
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Erosion-control structure - clearing and grubbing, excavation, import of 50,000 cubic yards of borrow material, installation of corrugated metal pipe, concrete pavement, and installation of rip-rap and gabions.
2007
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Irrigation-Installation of a new, 7 mg storage pond with lining and floating cover. Installing a skid-mounted pumping station and a chlorination facility. Relocating the existing 5,000 gallon pressure tank and air compressor to the new pond site. Work included grubbing, excavation and grading, concrete foundations, U.G. pipe placement, pre-engineered fiberglass building assembly and installation, mechanical piping systems, painting, electrical, power systems, fencing, computer controls, instrumentation, computer programming, and testing of electrical and mechanical systems.
2007
Fort Bliss MATOC
El Paso, TX
U.S. Army Corps of Engineers
BCT-1, Street, and BCT-2 roadway lighting -earthwork, trenching, boring, transformers, conduit, wiring, light poles, bases, panel boards, controllers.
2008
Fort Bliss MATOC
El Paso, TX
U.S. Army Corps of Engineers
Unit Operations Fac. Main Cantonment
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Underground storage tank- permanently close underground storage tanks at three separate facilities.
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Range 13 upgrade-installing a new drainage system for the entire range to allow water to shed without flooding coffins. Installing new solar panel pads built into the berm area adjacent to coffins to stop breakage from bullet deflection. Installing 30x60x10 pole barn enclosed on 3 sides to allow storage of materials and equipment.
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Wastewater treatment plant -Installing a pumping station and 2,000 gallon pressurized storage tank. Excavation & grading, concrete foundations, U.G. pipe placement, mechanical piping systems, electrical, computer controls, instrumentation, wiring, computer programming and testing of electrical and mechanical systems.
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
New Parking Lot- Included clearing and grubbing, grading, extension to the existing storm drainage, paving, striping and construction of a new storm water runoff detention basin.
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Rangers towers- demolish and remove existing range control towers.
2008
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Range reconstruct & upgrade- included demolition of existing range structures and berms, and significant lead abatement. Restructured the range layout by cut and full of over 30,000 cubic yards of material.
2008
Air National Guard TOC
Tucson, AZ
Department of the Army
Water Distribution Upgrade-Excavation, replace the existing main distribution gate valves water service valves to include stop and waste valves, valve boxes, meter and associated piping, fire hydrants, fire hydrants offsets, post indicator valves (PIV), and associated piping and the installation of new water meter vaults.
2008
Air National Guard TOC
Tucson, AZ
Department of the Army
Well abandonment-Installation and restoration of 11 wells.
2008
Cabeza Prieta Border Vehicle Barrier
Ajo, AZ
Sundt Construction Company33.5 miles of permanent vehicle barriers - included clearing and grubbing of construction access road and disposal of stripping, drilling of caisson footing, concrete production with volumetric equipment, placement of concrete fittings, steel erection and welding. Roadway maintenance for construction access haul road along border from Lukeville, Arizona to the project site. Installation of all permanent barriers for the 33.5 mile segment to include PVB and Normandy Barriers.
2008
Mountain Road Loop Trail
Lake Mead, NV
National Park Service
17.3 miles of the River Mountain Loop Trail (Road) within the Lake Mead National Recreation Area and Trailhead parking lot. - included installation of 12-ft wide asphaltic concrete and Portland cement reinforced concrete shared use pathway and 3.3 miles of equestrian use pathway.
2008
Fort Bliss MATOC
El Paso, TX
U.S. Army Corps of Engineers
Communications infrastructure
2009
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Range reconstruction and upgrade-demolition and re-configuration. Remove and relocate existing berms to allow for the entire range to take the new position.
2009
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Parking lot expansion- included clearing and grubbing, grading, extension to the existing storm drainage, paving and striping.
2009
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Landscape air park - Construction of a high visibility commemorative airpark. Included substantial excavation, cut and fill, paving, striping construction of retaining walls, curb, gutter and sidewalk, and landscaping the entire site.
2009
Fort Huachuca MACC
Fort Huachuca, AZ
Department of the Army
Hatfield Airpark UAV-Constructing a new wall to match existing, install new sprinturf grass, install solar lighting under aircraft, landscaping and mounting aircraft. Install boulder and plaque.
2009
L1 Border Vehicle Barrier
Sierra Blanca, TX
ECC
4.63 miles of permanent vehicle barriers - included clearing and grubbing. Disposal of stripping, drilling of caisson footing, concrete production, placement of concrete fittings, steel erection and welding. Installation of all permanent barriers for the 4.63 mile segment to include PVB Floating Fence, P2 Low Water Crossing Fence and Normandy Barriers. The project also included the construction and maintenance of a 5 mile roadway to accommodate heavy equipment access along the border to, and along, the project site.
2009